Carousel

Sponsored Links

Looking for House and Lot Within Tagaytay Area? CONTACT US!

Name

Email *

Message *

Showing posts with label Rodrigo Duterte. Show all posts
Showing posts with label Rodrigo Duterte. Show all posts

Sunday, February 02, 2020

Duterte orders temporary travel ban on travelers from China amid nCoV threat

Amid the current novel coronavirus (nCoV) President Rodrigo Duterte has ordered a temporary travel ban on all travelers coming from mainland China and its special administrative regions Hong Kong and Macau.
Ads



In an interview with Dobol B sa News TV, Senator Bong Go announced the president's order.

"Sa ngayon ay mag-i-implement na ng temporary travel ban on travelers coming from any part of China and its special administrative regions on top of the existing temporary travel ban imposed on those coming from Hubei province and other affected areas. Taking into consideration the concerns raised by key government officials and health experts, the President made a decision and has agreed to adopt this recommendation and implement it immediately as additional precautionary measure to protect the Filipinos," he said.

"Magkakaroon tayo ng temporary ban banning the entry of any person except Filipino citizens and holders of permanent resident visa issued by the Philippine government directly coming from China and its special administrative regions. Kung ibang bansa naman ang pinanggalingan mo pero nanggaling ka sa China within 14 days before arrival at hindi ka Pilipino o Philippine resident, hindi ka makakapasok sa Pilipinas," he further explained.
Ads



Sponsored Links

In a press conference on Sunday, February 2, health officials confirmed the first nCoV death in the Philippines: a 44-year-old male who died on Saturday, February 1.  While the patient was stable and showed signs of improvement in his last few days, his condition deteriorated within his last 24 hours resulting to his demise.

It was disclosed that the country recorded two confirmed cases: a 38-year-old Chinese female and her companion, a 44-year-old Chinese male. Both patients are from Wuhan, China and arrived in the Philippines via Hong Kong last January 21. They were both admitted for isolation and supportive treatment at the San Lazaro Hospital in Sta. Cruz, Manila.

The DOH's Epidemiology Bureau (EB) is urrently conducting contact tracing of passengers aboard the flights of the two positive cases. EB has secured the manifestos of the flights and is in close coordination with the concerned airlines. Contact tracing activities are ongoing in Cebu and Dumaguete, and in other places where the patients stayed and traveled to.

“The Philippine Government has already implemented a temporary travel ban for travelers coming from China, Macao, and Hong Kong. DOH is monitoring every development on the 2019-nCoV very closely and is taking proactive measures to contain the spread of this virus in our country. This health event is fast-evolving and fluid. We are continuously recalibrating our plans and efforts as the situation develops,” Health Secretary Francisco Duque III said.

“We are providing the public with constant updates and advisories as frequently as possible, so all I ask from the public now is to heed the advisories from official DOH channels and to refrain from sharing unverified and unvalidated information. I assure the public that we will keep you abreast of any information that we have,” he added.
Related news:
©2019 THOUGHTSKOTO

Monday, July 03, 2017

P461B and 28 Infrastructure Projects of Duterte Compared to PNoy After One Year in Office

In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below

In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him. 
President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible. 
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
The previous administration during its first year has only four ongoing  projects.
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
The present administration, however, on its first year already has 28 ongoing infrastructure projects.


Inclusive Partnerships for Agricultural Competitiveness(IPAC)
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Eastern Visayas Regional Medical Center (EVRMC) Modernization Project 
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Modernization of Governor Celestino gallares Memorial Hospital Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Metro Manila Flood Management Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below

Metro Manila Rapid Bus Transit (BRT) EDSA
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below

Ninoy Aquino International Airport (NAIA) PPP Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Maritime Safety Capability Improvement project for the PCG , Phase II
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2)
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Expansion of the Philippine Rural Development Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project 
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below

Plaridel Bypass Road Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
New Cebu International Container Port Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below North-South Railway South Line Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Malitubog-Maridagao Irrigation Project, Stage II
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below New Nayong Filipino at Entertainment City
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Malolos-Clark Railway Project (PNR North 2)
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Cavite Industrial Area Flood Risk Management Project
Clark International Airport (CIA) Expansion Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS)
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box belowAustralia Awards and Alumni Engagement Program-Philippines

Project Approval and Change in Financing of Chico River Pump Irrigation Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project)
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below Change of Financing in the New Centennial Water Source- Kaliwa Dam Project
In spite of the critics and detractors, the President continuous to tirelessly work as he promised to the people who voted for him.  President Rodrigo Duterte's first year as President of the Republic is said to be better than the previous administration. With a total of 28 infrastructure projects already rolling and capital outlay amounting to P 461.259 Billion as compared to former president Aquino with four infrastructure projects and capital outlay of P135.659 Billion. The "Golden Age of Infrastructure" for the Philippines, as the government envisions is evidently visible.   The previous administration during its first year has only four ongoing  projects.  The present administration, however, on its first year already has 28 ongoing infrastructure projects.  Inclusive Partnerships for Agricultural Competitiveness(IPAC)  Eastern Visayas Regional Medical Center (EVRMC) Modernization Project   Modernization of Governor Celestino gallares Memorial Hospital Project  Metro Manila Flood Management Project   Metro Manila Rapid Bus Transit (BRT) EDSA  Increase in Passenger Terminal Building Area (PTBA) Of the Bicol International Airport  Change in Scope of Bohol Airport Construction and Sustainable Environment Protection Project   Ninoy Aquino International Airport (NAIA) PPP Project Maritime Safety Capability Improvement project for the PCG , Phase II Scaling up the second Cordillera Highlands Agricultural Resources Management Project (CHARMP 2) Expansion of the Philippine Rural Development Project  Improvement/Widening of General Luis Road (Quezon City to Valenzuela City) Project     Plaridel Bypass Road Project  New Cebu International Container Port Project North-South Railway South Line Project Malitubog-Maridagao Irrigation Project, Stage II New Nayong Filipino at Entertainment City Mindanao Railway Project (MRP) Phase 1 Davao-Tagum-Digos Segment Malolos-Clark Railway Project (PNR North 2) Cavite Industrial Area Flood Risk Management Project Clark International Airport (CIA) Expansion Project Education Pathways to Peace in Conflict-affected Areas of Mindanao (PATHWAYS) Australia Awards and Alumni Engagement Program-Philippines   Project Approval and Change in Financing of Chico River Pump Irrigation Project New Communications, Navigation and Surveillance/Air Traffic Management (CNS/ATM) System Development Program: 30 Month Loan Validity Extension and Reallocation of Funds New Configuration of LRT Line 1 Extension Project Common Station/ Unified Grand Central Station (North Station Project) Change in Scope, Cost and Financing Arrangements For Arterial Road Bypass Project Phase II Change of Financing in the New Centennial Water Source- Kaliwa Dam Project   Read More:       ©2017 THOUGHTSKOTO www.jbsolis.com SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below
Read More:






©2017 THOUGHTSKOTO
SEARCH JBSOLIS, TYPE KEYWORDS and TITLE OF ARTICLE at the box below